Name | Kamatsusawa Downstream Sabo Dam |
---|---|
Prefecture | Tochigi Pref. |
Name of Main River | Daiya River |
Name of Branch | Inari River |
Year of Completion | 1933 |
Managed by | Nikko Sabo Work Office, MLIT |
Comment | Designed by Makoto Kaba. Constructed at the valley which was vertically eroded by a major flooding in 1902. Topographical conditions are well reflected in the dam configuration. |
Data Source | Sabo Frontier Foundation Material |