Home
News Letter
Conference
Definition of Technical Term
Law
Cases of Disaster
Data
Projects
Technical Guideline
Historical Facilities
International Technology Exchanges
New Technology
About Us
Links
New Technology
Water Level Gauge and Rain Gauge for Community Early Warning System (CEWS)
Ground Survey by means of Unmanned Helicopter
Ring Net for Slope Protection
P.A.P.( Piles and Arched Panel )Dam
Remodeling of Sabo Dam by installing slits
Automated Monitoring System on the landslide
Aircraft-mounted laser profiler
Non-Frame Method employed for the slope failure prevention project
Warning System employing Photo Chronograph Technology
Sabo Dam made of Wire Net
Unattended Construction Work on the Slopes
A Experimental Work employing Bon Terrain Method
A New Technology Making the Most Use of Materials available on Site Placement Work of the Concrete made of Boulders
Erosion Control Dam making the most use of Thinned Wood
Sabo Dam with Alternate Dual Axes
Facing Work on the Surface of a Sabo Dam by Neo-Natural River Reconstruction Method
Afforestation Project employing the Revegetation by wood chip back
Slope Stabilization Works by Green Lexar Method
Open-Type Sabo Dam
Sabo Dam made of Soil Cement ( INSEM )
Groundsill made by Sabo-CSG Method
Copyright © 2004 International Sabo Association. All rights reserved