INTERNATIONAL SABO NETWORK

Category of site

  • Home
  • News Letter
  • Conference
  • Definition of Technical Term
  • Law
  • Cases of Disaster
  • Data
  • Projects
  • Technical Guideline
  • Historical Facilities
  • International Technology Exchanges
  • New Technology
  • About Us
  • Links

New Technology


  • Water Level Gauge and Rain Gauge for Community Early Warning System (CEWS)
  • Ground Survey by means of Unmanned Helicopter
  • Ring Net for Slope Protection
  • P.A.P.( Piles and Arched Panel )Dam
  • Remodeling of Sabo Dam by installing slits
  • Automated Monitoring System on the landslide
  • Aircraft-mounted laser profiler
  • Non-Frame Method employed for the slope failure prevention project
  • Warning System employing Photo Chronograph Technology
  • Sabo Dam made of Wire Net
  • Unattended Construction Work on the Slopes
  • A Experimental Work employing Bon Terrain Method
  • A New Technology Making the Most Use of Materials available on Site Placement Work of the Concrete made of Boulders
  • Erosion Control Dam making the most use of Thinned Wood
  • Sabo Dam with Alternate Dual Axes
  • Facing Work on the Surface of a Sabo Dam by Neo-Natural River Reconstruction Method
  • Afforestation Project employing the Revegetation by wood chip back
  • Slope Stabilization Works by Green Lexar Method
  • Open-Type Sabo Dam
  • Sabo Dam made of Soil Cement ( INSEM )
  • Groundsill made by Sabo-CSG Method

  • Sitemap
  • Contact Us

Copyright © 2004 International Sabo Association. All rights reserved